Oaks Minnehaha
Minneapolis, MN
Challenge:
Tight site conditions and close proximity to the Light Rail Blue Line made it more challenging to coordinate the building’s plumbing utility connections.
Solution/What Worked:
The sanitary and storm sewer piping were strategically routed at the perimeter of the parking garage ceiling space to maximize the pipe inverts and to minimize impact on parking stalls and drive aisle clearances.
Fun Fact:
This project includes a 2,000 sq. ft. hydronic snow melt system at the sloped ramp down to the underground parking garage. A snow/ice sensor is used to automatically detect frozen precipitation and energize the system as needed, keeping the ramp clear of snow.
Engineering the better way
Contact us today to tackle every phase of your next project with full-service expertise and business-driven partnerships designed to make an impact.
Twin Cities Office:
21308 John Miless Dr. |
Suite 104|
Rogers MN 55374
Location Rep: Aaron Mueller, PE, LEED AP
Twin Cities Office:
St. Cloud Office:
3339 W. Germain St. |
Suite 250|
St. Cloud MN 56301
| (320) 217-5597
Location Rep: Daniel Folsom, PE
St. Cloud Office:
Alexandria Office:
120 17th Ave. W. |
Alexandria MN 56308
Location Rep: Jeremy Anderson, PE, LEED AP
Alexandria Office: